What is the difference between Procurement for stock vs consumption?
SAP Online Classes provides Best SAP training Online based on current industry standards that helps attendees to secure placements in their dream jobs at MNCs. SOC is one of the most credible ERP SAP Online training provider, offering hands on practical knowledge and full job assistance with basic as well as advanced level ERP SAP Implementation Training. At SOC ERP SAP training Online is conducted by subject specialist corporate professionals with 14+ years of experience in managing real-time ERP SAP projects.
What is the difference between Procurement for stock vs consumption?
Answer
-
Procurement for Stock – A stock material is a material that is kept in stock. These materials are kept in stock once received from the vendor. The stock of this material keeps on increasing or decreasing based on amount of the quantity received or issued. To order a material for stock, the material must have a master record within the system.
Procurement for Direct Consumption – When procurement is for direct consumption i.e. it will be consumed as soon as it is received, the user should specify the consumption purpose. To order a material for consumption, the material may have a master record within the system.